STEPS TO PURCHASE
If an aircraft is not available, SkyRunner will begin manufacturing your aircraft once raw material costs are covered.
- Select Your Accessories & Options
- Signed Aircraft Purchase Agreement
- Manufacturing Deposit: Wire Transfer Instructions
- Flight Training Dates (select available dates)
- International Orders: Bilateral Agreements (SkyRunner can coordinate)
Customers can secure the next available MK 3.2 delivery position for $9,500.00. The following terms apply to the Standard Deposit Program:
The undersigned (“Buyer”) is making a deposit with SkyRunner for the purchase of a SkyRunner MK 3.2 according to the following Deposit Agreement. As used herein, “SkyRunner” refers to SkyRunner, LLC., a Louisiana limited liability company.
Section 1: DEPOSIT
This Deposit Agreement outlines the deposit terms for the SkyRunner MK 3.2
Performance Specifications:
ASTM Standards: Aircraft will meet or exceed: A) requirements established by ASTM F2244 standard: “Design and Performance Requirements for Powered Parachute Aircraft,” or B) conditions set forth by the FAA in an FAA exemption that allows operation under 14 CFR (exemption # 15422A)
Max Takeoff Weight: 1800-pounds (unless public use)
Seats: 2 people
Useful Load: 580-pounds
FAA Exemption # 15422B
Pricing Includes:
(i) Online Access to nearby Service & Maintenance Centers
(ii) Spare Parts
(iii) Videos & Tutorials
Pricing Does Not Include:
(i) Aircraft Delivery
(ii) Pilot Training
*To begin Purchase or Construction of your aircraft, please see Section 8.2 for wire instructions.
*International Pricing is unique to Domestic Pricing.
For Sales within the United Kingdom, United Arab Emirates, Saudi Arabia & Australia
SkyRunner MK 3.2
*Price: Contact Us
Deposit (PD): $9,500 USD
Refundable: No
Estimated Delivery Time: 2 to 8 months (depending on placement in line)
*Price is subject to change: CPI, production costs, end use, geography, regulations, and “package”
NOW, THEREFORE, in consideration of the mutual covenants set forth herein and other good and valuable consideration, receipt of which is acknowledged, SkyRunner and Buyer (each a “Party,” and collectively the “Parties”) agree as follows:
Section 2: POSITION LIST AND DELIVERY
Section 2.1 – Upon receipt of a signed Deposit Agreement and Position Deposit, SkyRunner will assign Buyer a delivery position (“Position Number”) on the position list. Delivery positions are offered on a first come, first served basis, and are subject to changes, as determined by SkyRunner in its sole discretion. [Production aircraft designated for SkyRunner marketing campaigns, demonstrators, flight testing, or any other exhibition or advertising activities are not intended for sale to the general public and are not considered part of the position list]
Section 2.2 – Production and delivery dates may vary. Scheduled date of delivery (“Delivery Date”) shall be determined in writing with the client.
Section 3: AIRCRAFT PURCHASE AGREEMENT; MANUFACTURING DEPOSIT
Section 3.1 – Prior to expected Delivery Date, SkyRunner will inform Buyer in writing of the expected initiation of production of the Aircraft (“Production Notice”) and provide Buyer with a form of SkyRunner’s Purchase Agreement (“Purchase Agreement”). The Purchase Agreement will include various terms and conditions, and depending upon the then current international, federal, state and/or local laws, may include certain conditions of purchase as required by then applicable international, federal state and/or local laws. The final purchase price (“Purchase Price”) will be listed in the Aircraft Purchase Agreement.
Section 3.2 –
(i) Buyer shall select any optional equipment or services for the Aircraft,
(ii) Buyer shall execute and deliver a counterpart of the Aircraft Purchase Agreement and
(ii) Buyer shall submit the Manufacturing Deposit.
SkyRunner must receive the 50% Manufacturing Deposit within 10 calendar days of your notified production schedule or else SkyRunner may alter delivery timeline. The balance of the Aircraft Purchase Price shall be due upon delivery, pursuant to the Aircraft Purchase Agreement. The Manufacturing Deposit may be made by check or wire transfer. Please see below for wire transfer information.
Section 4: SPECIFICATIONS
Section 4.1 – The Preliminary Standard Specifications of the Aircraft are shown on “Exhibit A” attached hereto. SkyRunner will, as part of the Aircraft Purchase Agreement, inform Buyer of the detailed specifications for the Aircraft, which will include final dimensions, standard equipment, performance specifications, documentation, etc. The terms of the Aircraft Purchase Agreement will supersede the terms of this Deposit Agreement and any other specifications referred to on our website or otherwise in any materials or information provided by or on behalf of SkyRunner.
Section 4.2 – Buyer expressly acknowledges that Buyer has not relied on any oral or written representations except as specifically stated in the Aircraft Purchase Agreement and that SkyRunner has made no representations as to the suitability of the Aircraft for any particular purpose of Buyer. Buyer acknowledges that the Aircraft is for recreational use and is not a general aviation aircraft and is not suited for commercial transport or aerobatics.
Section 5: DEPOSITS; PURCHASE PRICE
Section 5.1 – On the Delivery Date, the Position Deposit and the Manufacturing Deposit (collectively, the “Deposits”), in each case including accrued interest, shall be applied to the Purchase Price.
Section 5.2 – Deposits shall be held in an interest bearing account (“Holding Account”) with JP Morgan Chase Bank or such other bank selected by SkyRunner in its sole discretion (“Bank”). Buyer agrees to provide information that may be requested by the Bank, including without limitation, information to confirm the Bank’s compliance with state and federal laws against terrorism and money laundering activities. When a Buyer executes an Aircraft Purchase Agreement, SkyRunner will direct the release of the Deposits (plus accrued interest) to be applied toward the Purchase Price.
Section 5.3 – The Purchase Price is exclusive of any sales or use tax, value-added taxes, duties, registration and licensing fees or any charges that may be levied by governmental authorities in connection with the purchase, sale, transfer, use, registration, export, import of the Aircraft (collectively, “Taxes”). Taxes required by law to be charged at the point of sale may be collected by SkyRunner. (Note: a deposit does not constitute a sale).
Section 6: TERMINATION
Section 6.1 – Buyer may cancel both position and manufacturing Deposit Agreement without penalty, in the event SkyRunner is unable to complete the assembly within 3 three months of receiving an initial deposit. The Position Deposit will be refunded to the credit card or account if used for such Deposits.
Section 6.2 – If the Buyer fails to make final payment of the Remaining Balance (against the Purchase Price) in a timely manner that is compliant with the Deposit Agreement or the Aircraft Purchase Agreement, the Seller may terminate this Deposit Agreement, and the deposit shall be forfeited to SkyRunner.
Section 7: LIMITATION OF LIABILITY FOR BUYER AND SELLER
NOT WITHSTANDING ANYTHING TO THE CONTRARY; (I) THE MAXIMUM LIABILITY BUYER SHALL HAVE TO SKYRUNNER FOR ANY BREACH OF THIS DEPOSIT AGREEMENT OR OTHERWISE ARISING OUT OF OR RELATING TO THIS DEPOSIT AGREEMENT SHALL BE FORFEITURE OF ALL DEPOSITS (PLUS ACCRUED INTEREST) MADE BY BUYER. (II) THE MAXIMUM LIABILITY SKYRUNNER SHALL HAVE TO BUYER FOR ANY BREACH OF THIS DEPOSIT AGREEMENT OR OTHERWISE ARISING OUT OF OR RELATING TO THIS DEPOSIT AGREEMENT SHALL BE A FULL REFUND AND IN NO EVENT SHALL EITHER PARTY BE LIABLE FOR CONSEQUENTIAL, INDIRECT, PUNITIVE, INCIDENTAL OR SPECIAL DAMAGES WHATSOEVER ARISING OUT OF OR RELATING TO THIS DEPOSIT AGREEMENT.
Section 8: NOTICES
Section 8.1 – Any notice to be given under this Deposit Agreement may be sent by email or by pre-paid overnight delivery (for example, FedEx) or wire transfer to Buyer’s address set forth below or to SkyRunner’s address set forth below. Each notice or demand shall be deemed to have been given or made when actually received or 24 hours after being sent, whichever occurs first.
Section 8.2 – Buyer acknowledges that “documents” associated with this Deposit Agreement may be digital and that such “documents” are agreed to be equivalent to “paper” documents. Also, communications to/from the email address specified by Buyer shall constitute delivery of the equivalent of “signed” documents.
Wire Transfer Instructions
For questions, please contact Sales at SkyRunner Sales: (318) 219-5722
SkyRunner, LLC
830 Havens Rd.
Shreveport, LA 71107 USA
Bank: Chase Bank
Swift Code: CHASUS33
Routing #: 065400137
FedEx Delivery
SkyRunner, LLC
Attn: Sales
830 Havens Rd,
Shreveport, LA 71107
Phone (318) 219-5722
Exhibit A: SPECIFICATIONS
SkyRunner MK 3.2
Performance Specifications:
ASTM Standards: Aircraft will meet or exceed the requirements as established by the ASTM standard: “Standard for Specifications for Design and Performance of a Light Sport Airplane.”
SLSA
Seats: 2
Maximum Takeoff Weight: 1,800-pounds (Exemption #15422A)
Dry weight: 1,220-pounds (pending options)
Fuel Cell: 16 gallons
Fuel: 91-93 Octane
Powerplant(s)
ProStar 1000 4-Stroke SOHC Twin Cylinder 89 hp.
– Drive: 4-Stroke SOHC Twin Cylinder
– Transmission: Automatic CVT P/R/N/L/H; Shaft
– Drive System: High Performance, On-Demand
– Cooling: Liquid
Rotax (190 hp Modified)
– Cooling: Liquid
– Fuel System: Electronic Fuel Injected / Turbo
Performance
– Maximum Speed: 70 mph (ground); 46 mph (air)
– Range: 200+ miles (ground); 100+ miles (air)
– Takeoff & Landing Distance: 600 ft
– Shocks: Fox Podium 1.5 & 2.0
Standard Equipment:
– Wing: 550 sqr ft
– Propeller: 4 blade 75″
– Engine Monitoring Systems #1 (EMS): State-of the-art EMS to continuously monitor the Rotax aircraft systems.
– Engine Monitoring Systems #2 (EMS): Digital Gauge: Speedometer, Odometer, Tachometer, Two Tripmeters, Hour Meter, Clock, Service Time, Diagnostic Indicator, Gear Indicator, Fuel Gauge, Hi-Temp/Low-Batt Lights, DC Outlet
– VHF Communication Radio
– Altimeter
– Fuel Gauge
Standard Documentation:
– Pilot Operating Handbook (POH) + APP
– Maintenance Manual (ground & air)
– Weight and Loading
– FAA Airworthiness Certificate